• ✿ Welcome ✿

    Hello Graphic #37

  • VoteRiders.com

    Votes Count. Be Counted.

  • Registration INFO

    Barack The Vote

  • The 2014 Mid Term’s Are Almost Here.

    GET OUT AND VOTE!! Mid Term Election Day Happens OnNovember 4th, 2014
    6 months to go.
  • The 2016 Iowa Caucus

    The The 2016 Iowa Caucus Happens OnJanuary 18th, 2016
    21 months to go.
  • 2016 Presidential Election

    We Elect The 45th President In The 58th Quadrennial U.S. Presidential Election OnNovember 8th, 2016
    2.6 years to go.
  • Pete Souza

  • Barack Obama

  • Michelle Obama

  • VP Joey B.

  • Dr. Jill Biden

  • The White House

    Official Blog

  • White House Blog

  • The White House

  • OFA

  • Michelle Obama Fan Club

  • Barack Obama

  • TheObamaCrat™

  • Erase Racism NOW™

  • Loudly & Proudly™

  • TheObamaCrat™ Archives

Guest Blog Post: Dr. Rex Horty, “The Keystone XL Tar Sands Pipeline.” STOP It.


 

By Dr. Rex

keyse

 

 

This is a vitally important reblog from the blog:

It Is What It Is

Dr. Rex …. Blogging for change.

 

The Keystone Pipeline System is a pipeline system to transport synthetic crude oil from the oil sands of Alberta, Canada, and crude oil from the northern United States, “primarily to refineries in the Gulf Coast” of Texas. The products to be shipped include synthetic crude oil (syncrude) and diluted bitumen (dilbit) from the Western Canadian Sedimentary Basin in AlbertaCanada, and Bakken synthetic crude oil and light crude oil produced from the Williston Basin (Bakken) region in Montana and North Dakota.

 

Two phases of the project are in operation, a third, from Oklahoma to the Texas Gulf coast, is under construction, and the fourth is awaiting U.S. government approval as of September 2013. Upon completion, the Keystone Pipeline System would consist of the completed 2,151-mile (3,462 km) Keystone Pipeline (Phases I and II) and the proposed 1,661-mile (2,673 km) Keystone Gulf Coast Expansion Project (Phases III and IV) . The controversial fourth phase, the Keystone XL Pipeline Project, would begin at the oil distribution hub in Hardisty, Alberta, and extend 1,179 miles (1,897 km), to Steele City, Nebraska.

 

ksp1

 

The operational Keystone Pipeline system currently has the capacity to deliver up to 590,000 barrels per day (94,000 m3/d) of Canadian crude oil into the Mid-West refining markets. In the summer of 2010 Phase 1 of the Keystone Pipeline was completed, delivering crude oil from Hardisty, Alberta, to Steele City, Nebraska, and then east through Missouri to Wood River refineries and Patoka, Illinois. Phase 2 the Keystone-Cushing extension was completed in February 2011 with the pipeline from Steele City, Nebraska, to storage and distribution facilities at Cushing, Oklahoma, a major crude oil marketing/refining and pipeline hub.

 

The Keystone XL proposal, which would comprise phases 3 and 4, faced criticism from environmentalists and some members of the United States Congress. In January 2012, President Barack Obama rejected the application amid protests about the pipeline’s impact on Nebraska’s environmentally sensitive Sand Hills region. TransCanada Corporation changed the original proposed route of Keystone XL to minimize “disturbance of land, water resources and special areas” and the new route was approved by Nebraska Governor Dave Heineman in January 2013.

 

On March 22, 2012, Obama endorsed the building of its southern segment that begins in Cushing, Oklahoma. The President said in Cushing, Oklahoma, on March 22, “Today, I’m directing my administration to cut through the red tape, break through the bureaucratic hurdles, and make this project a priority, to go ahead and get it done.”

 

ksp2

 

 

In its Supplemental Environmental Impact Statement (SEIS) released for public scrutiny in March 2013, the United States Department of State Bureau of Oceans and International Environmental and Scientific Affairs, described a number of changes to the original proposals including the shortening of the pipeline to 875 miles (1,408 km); its avoidance of “crossing the NDEQ-identified Sand Hills Region” and “reduction of the length of pipeline crossing the Northern High Plains Aquifer system, which includes the Ogallala formation”; and stated “there would be no significant impacts to most resources along the proposed Project route.”

 

In response to the Department of State’s report, which recommended neither acceptance nor rejection, the editor of The New York Times recommended that President Obama, who acknowledges climate change as one of humanity’s “most challenging issues”, should reject the project, which “even by the State Department’s most cautious calculations — can only add to the problem.”

 

gen

 

 

Officials at the White House and the State Department announced that they would “examine in depth alternative routes” for the Keystone XL pipeline and that this process “could be completed as early as the first quarter of 2013”.

 

This amounts to an effective rejection of the pipeline. During TransCanada’s third quarter results call in early November, CEO Russ Girling told analysts that “(s)hipping contracts have sunset clauses that could be triggered by a long delay if the administration delays the project long enough that it becomes a low probability that they will ever get it through in a time frame that meets their needs, they are not going to support us anymore.”

 

Analysis by Oil Change International indicates that the contracts signed between TransCanada and its customers – producers, traders and refiners – are potentially invalidated if oil is not flowing by the end of 2013. With two years needed for construction, work would need to start in early 2012 to stand a chance of meeting these contractual agreements.  Thus, this decision is likely an “effective rejection” of the Keystone XL pipeline.

 

Full article can be read Here.

 

oilco

 

 

Continuation …

In April 2013, the EPA challenged the U.S. State Department report’s conclusion that the pipeline would not result in greater oil sand production, noting that “while informative, [it] is not based on an updated energy-economic modeling effort.” Overall, the EPA rated the SEIS with their category “EO-2″ (EO for “environmental objections” and 2 for “insufficient information”).

 

KEYSTONE PIPELINE (FINISHED PHASE 1)

 

220px-Keystone-pipeline-route

 

 

Keystone Pipeline Route (all phases, operational and proposed)
LOCATION
COUNTRY Canada
United States
FROM Hardisty, Alberta
PASSES THROUGH Regina, Saskatchewan
Steele City, Nebraska
TO Wood River, Illinois
Patoka, Illinois (end)
GENERAL INFORMATION
TYPE Crude oil
OWNER TransCanada
CONSTRUCTION STARTED 2008
EXPECTED Projected in-service

date of 2015

COMMISSIONED June 2010
TECHNICAL INFORMATION
LENGTH 3,456 km (2,147 mi)
MAXIMUM DISCHARGE 590 Mbbl/d (~2.9×10^10 t/a)
DIAMETER 36 in (914 mm)
NUMBER OF PUMPING STATIONS 39

 

The Keystone XL pipeline would have transported toxic tar sands from under Canada’s Boreal forest 2,000 miles to the Gulf of Mexico to be refined and exported. Approving the pipeline would bring increased production of one of the dirtiest, most polluting forms of oil over the coming decades.

 

Tar sands oil is not only difficult, costly and energy-intensive to produce but also dirtier and more corrosive than conventional oil. Leaks and spills threaten rivers, aquifers and communities all along the route.

 

Killing more jobs than it creates

 

Photo: NTSB The tar sands pipeline that spilled a million gallons of toxic heavy oil into Michigan’s Kalamazoo River last summer illustrates the dangers this type of uniquely corrosive oil will bring along the Keystone XL route.

Photo: NTSB The tar sands pipeline that spilled a million gallons of toxic heavy oil into Michigan’s Kalamazoo River last summer illustrates the dangers this type of uniquely corrosive oil will bring along the Keystone XL route.

 

According to the U.S. State Department the pipeline would create at most 6,500 temporary construction jobs, and would leave only “hundreds” of permanent jobs, according to TransCanada, the Canadian company that wants to build the pipeline. Claims that the pipeline would employ tens or even hundreds of thousands of people are simply not true. A Cornell University study concludes the pipeline would kill more jobs than it would create, by reducing investment in the clean energy economy.

 

Tar Sands oil is the dirtiest oil on the planet

Producing synthetic crude oil from tar sands generates three times the global warming pollution of conventional crude production. Extracting tar sands bitumen – a low-grade, high-sulfur crude oil that must be extensively refined to be turned into fuel – uses vast amounts of energy and water.

 

 

tar

 

Canadian tar sands oil would be exported

Keystone XL would have diverted Canadian oil from refineries in the Midwest to the Gulf Coast where it could be refined and exported. Many of these refineries are in Foreign Trade Zones where oil may be exported to international buyers without paying U.S. taxes.

 

The facts reveal this pipeline was never in America’s national interest. Clean energy and fuel efficiency is the path forward for economic and energy security in America – not another tar sands pipeline. By rejecting the Keystone XL pipeline, President Obama is helping move America down a cleaner, safer path.

 

 

Reject Keystone XL

 

Published on Aug 5, 2013

The Keystone Pipeline will drive up oil prices, stifle job growth, benefit foreign companies, damage the environment, and fuel global warming.

Get the facts and stand with the truth at http://action.nextgenclimateaction.or….

Created by Portal A
Editing & Visual Effects: Cinesaurus

Paid for by NextGen Climate Action.

 

 

 

3 Reasons to Build the Keystone XL Pipeline

 

Published on Feb 17, 2013

Few energy projects have inspired the level of vitriol surrounding the Keystone XL Pipeline, that would run 1,700 miles from Alberta, Canada through the United States to refineries on the Gulf of Mexico.

The oil sands of Alberta are estimated to hold 170 billion barrels of petroleum, the largest reservoir of black gold outside of Saudi Arabia.

Because the pipeline crosses an international boundary, President Barack Obama has the final say over whether to give the project a green light.

 

 

 

Here are three reasons to build the pipeline:

 

kst

 

1. The oil isn’t going to stay buried.

American environmentalists oppose the pipeline partly because they oppose the burning of fossil fuels — especially those extracted from relatively dirty “oil sands.” But if America doesn’t build the pipeline, that oil is still going to be processed and enter the environment. It’ll just get bought by China and other countries looking for cheap and plentiful energy. And TransCanada, the company behind the pipeline, is already working on contingency plans to do just that

 

2. The pipeline isn’t a disaster waiting to happen.

Opponents say that the proposed route dangerously strays over part of the Ogallala Aquifer in Nebraska, which supplies water for 20 million people. The governor of nebraska has urged president obama to start building. TransCanada has already agreed to redirect the pipeline to minimize hazards. It’s also agreed to encase the pipeline in cement and post a $100 million bond to cover any possible cleanups.

 

oils

 

3. It will help the economy.

Estimates for jobs related to the pipepline run everywhere from 6,000 to a quarter of a million, with TransCanada saying it will hire 15,000 workers to build the thing. The exact figures are unknowable, but once it’s up and running, Keystone XL will adds billions of dollars in ongoing economic activity and tax revenues.

 

President Obama has the authority to stop the pipeline if he determines that it’s not “in the national interest.” Given the potential upsides of the project, the relative ease with which environmental concerns can be addressed, and the president’s own commitment to what he calls “an all of the above energy strategy,” it’s hard to conjure up a strong case against building the Keystone XL pipeline.

 

keyred

 

 

Here are 5 reasons why building the Keystone pipeline is bad for the economy — and workers.

 

1. Building the Keystone pipeline and opening up the Tar Sands will negatively impact national and local economies.

 

2. The same fossil fuel interests pushing the Keystone pipeline have been cutting, not creating, jobs.

 

3. Unemployment will rise.

 

4. Poor and working people will be disproportionately affected.

 

5. Building the sustainable economy, not the Keystone pipeline, will create far more jobs.

 

Full article can be read Here.

 

Sources/Related articles:

1. Keystone Pipeline

 

2. NRDC (Natural Resources Defense Council) Facebook Page

 

3. The Keystone Pipeline XL

 

4. Natural Resources Defense Council

 

trans

 

 

We ALL are ONE!! We ALL are connected by NATURE!!

 

Thank you SO much Dr. Rex …. Blogging for change and your magnificent blog: It Is What It Is.

 

Take a moment and drop by her blog….It Is What It Is.

 

120118_keystone_protestors_605_reut

daryl-hannah-keystone-protest.gi.top

Keystone-pipeline-protest-007

KeystoneXLprotest

no-keystone.gi.top

occupy-earth

cropped-b4peace-header

enoughisenough2 (1)

 

15 Responses

  1. … [Trackback]

    [...] Informations on that Topic: theobamacrat.com/2013/12/18/guest-blog-post-dr-rex-horty-the-keystone-xl-tar-sands-pipeline-stop-it/ [...]

  2. […] Guest Blog Post: Dr. Rex Horty, “The Keystone XL Tar Sands Pipeline.” STOP It. […]

  3. I’ll be awake all night over this. :) Seriously, I bet I’ve signed dozens of petitions and e-mailed my legislators… they must be well-paid under the table not to know how bad this is for our environment.

  4. Seriously, they should make solar power affordable. We just had something set up for the water heater, but it cost us $6 K.

  5. […] Guest Blog Post: Dr. Rex Horty, “The Keystone XL Tar Sands Pipeline.” STOP It.. […]

  6. Excellent!!! Loved what you added!! Thank you so much for the “shout out”!! Appreciated!!! :-)

Reply At Your Own Risk

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 110,254 other followers

%d bloggers like this: